Update project controlling Excel from timesheet CSV emails in Outlook

Runs on a schedule to read timesheet CSV emails from Outlook and update the project controlling Excel workbook with monthly and cumulative values.

What it does

Reads the separate sheet “ Cumulative Basis (Kumulgrundlage)”, checks whether the current month already exists, and whether the cumulative values (previous year's total + new month) are correct. Uses an Excel workbook session to write the month headers and cumulative values atomically (create a new column OR correct an existing one).

The steps

  1. Schedule Trigger
  2. Get many messages
  3. Identify Attachments
  4. Upload the template to OneDrive
  5. Find the last line
  6. Generate Ranges Dynamically
  7. Retrieve batch ranges
  8. structure ranges
  9. Structure Planned "PLAN" and Actual "IST"
  10. Extract PLAN Values
  11. Extract Actual "IST" Values
  12. Merge Data
  13. Calculate deviations
  14. Extract Acuaul Values "IST"

32 steps in total.